Skip to content

Pilot & next steps

LOI, NDA, and suggested pilot scope.

← Start here


LOI (26.05.2026)

Customer Theegarten-Pactec GmbH & Co. KG, Dresden
RapidDraft Jamil, Raza, Sajjala (pre-incorporation founders)
Customer signatory Benedikt Schulte, Director Engineering & Development
Systems SOLIDWORKS, CIM Database
Next Pilot Agreement / SOW

Indicative scope: drawings & BOMs; process standardization; data quality; design errors; traceability; change management; machinery / functional safety; naming & documentation; engineering knowledge.


NDA (short)

Mutual NDA same date — 2-year term, 5-year confidentiality on disclosures. Covers drawings, CAD, workflows, models. Use only to evaluate pilot. Drawings remain customer property.


Suggested pilot (8–12 weeks)

Week Activity
1–2 Discovery: CIM deployment, sample module, CONTACT API
3–4 Integration spike: read released package
5–8 Pilot runs with engineering
9–12 Review KPIs, SOW for production

Deliverables: controlled deployment, rule set v1, findings report format, evaluation summary.

Out of scope for pilot 1: full EPLAN sync, EMPB automation, functional safety certification.


Success metrics

  • Release defects found before sign-off
  • Review time per change package
  • % findings with valid drawing/BOM pointer
  • Engineer acceptance rate

Customer documents