Skip to content

Theegarten-Pactec — start here

RapidDraft pilot prep for Theegarten-Pactec (packaging machines, Dresden).
Written for mechanical engineers and engineering leads preparing a customer demo.


In one sentence

Before a module is released in CIM Database, RapidDraft checks the drawing + BOM package, flags issues with clear references, and leaves release approval with the engineer.


Read in this order

Step Page Why
1 What they need Marcel’s requirements — what must be true for a “yes”
2 Use cases & problems Pain points and use cases from emails & research
3 Their tools SOLIDWORKS, EPLAN, CIM Database — how they work today
4 Release check demo The 60‑minute story we show in the meeting
5 PLM integration How we connect to CIM Database (high level)
6 Data security On‑prem / controlled environment — their hard gate
7 Demo day checklist Timing, slides, what not to say

Later / optional: Quality forms · Pilot & next steps · Glossary

Customer leave-behind: Brief (EN) · Kurzfassung (DE)

Internal only: Cerpro comparison · All source files


Demo example (what we walk through)

Module: folding unit / sensor bracket assembly (typical packaging-machine change)

  1. SOLIDWORKS drawing updated
  2. BOM changed
  3. EPLAN sensor reference affected
  4. Package goes to release in CIM Database
  5. RapidDraft reviews → numbered findings (sheet, zone, BOM line)
  6. Engineer approves or rejects — PLM stays in charge

Details: Release check demo


Account facts

Company Theegarten-Pactec GmbH & Co. KG, Dresden
Product Packaging machinery (food / confectionery / non-food)
Mechanical CAD SOLIDWORKS
Electrical EPLAN
PLM CIM Database (CONTACT Software)
Key contact Dr.-Ing. Marcel Eggert (Engineering)
LOI date 26.05.2026 — pilot scope agreed in principle; SOW still to write

Four things that decide the deal

  1. Controlled deployment — data and AI in their environment, not public cloud by default
  2. CIM Database fit — not a side tool; works with release workflow
  3. Drawings + BOMs — concrete checks, not generic chat
  4. Traceability — every finding points back to a drawing or BOM line; engineer signs off

Expanded checklist: What they need


What this is not

  • Not a PLM replacement
  • Not autonomous release
  • Not “AI transformation” slides
  • Not supplier EMPB automation as the first demo (that’s phase 2: Quality forms)