Go to Market¶
Operational source:
/Users/adeelyj/Library/CloudStorage/OneDrive-Personal/100_Knowledge/203_TextCAD/01_Product_Project_Management/00_Project_Management_n_skills/01_tracks/go-to-market
This page is the local wiki mirror of the operational MASTER_PLAN.md and TRACKING.md.
Last updated¶
2026-06-18
Current overall score¶
Go to Market overall score: 72 / 100
The score moves from 67 to 72 because June materially improved the external proof surface:
Theegarten-specific follow-up, architecture/local-AI framing, bilingual website direction, and
concrete pilot next steps. The score is still capped because the pilot pipeline is not yet one
governed view, website branch/deploy truth still needs discipline, and RapidCRM scheduled outreach
has a known reliability gap.
Current posture¶
The current external story has two related motions:
- live product proof around CAD Drive, Agent, Drawing Analysis/DraftLint, and Expert workflows
- customer follow-up proof around Theegarten-Pactec, controlled local/private AI, and a release-check pilot path
Milestone scorecard¶
| Milestone | Score / 100 | Current state | Main remaining gap |
|---|---|---|---|
| Canonical product narrative | 78 | Working and sharper | Core-vs-Studio and app-vs-website language still need discipline. |
| Competition and application assets | 82 | Strong | Needs one current source-of-truth list. |
| Pilot pipeline | 69 | Real but distributed | Needs one governed view of prospects, status, owner, next action. |
| Company-tailored materials | 84 | Strong | Asset library remains distributed across website, wiki, pilot folders. |
| Outreach operations | 44 | Early with reliability plan | RapidCRM send-only worker/status cleanup not implemented yet. |
| Current traction readiness | 68 | Improving | Feedback capture, CRM reliability, and pipeline governance need a tight loop. |
Feature scorecard¶
| Feature track | Score / 100 | Current note |
|---|---|---|
| Positioning | 81 | Stronger after Theegarten release-check and controlled local/private AI framing. |
| Pitch system | 82 | Strong, but should be refreshed against current Theegarten proof. |
| Pilot targeting | 72 | Real assets exist; central status tracking is still light. |
| Outreach workflow | 44 | RapidCRM exists but scheduled-send reliability needs the planned fix. |
| Application readiness | 82 | Strong asset coverage. |
| Proof and credibility assets | 84 | Website, Theegarten wiki, local-AI architecture, CAD Drive, DraftLint, Agent proof. |
Active updates¶
2026-06-18 - Website, Theegarten follow-up, and CRM reliability refresh¶
The website repos now contain Theegarten follow-up and broader site polish work. The local wiki has Theegarten and local-AI supporting pages. The RapidCRM reliability plan documents a send-scheduling failure mode and the required send-only worker/status/monitoring fix.
2026-06-08 - Theegarten follow-up page becomes the lead customer asset¶
https://rapiddraft.ai/theegarten-pactec is the immediate customer-facing follow-up asset. It
should explain RapidDraft as the engineering review layer, keep local/private AI behind a
controlled backend boundary, avoid overclaiming about autonomous release, and present an 8-12 week
pilot path.
2026-05-26 - Website branch reconciliation preserved the non-Google NDA flow¶
The website reconciliation plan keeps the Netlify form capture plus local PDF NDA/LOI path and avoids reintroducing the Google Docs/Drive NDA path.
Highest-value next actions¶
- Create one pilot pipeline view with target, owner, status, next action, asset link, and last contact.
- Verify live website branch/domain state before sending or referencing pages.
- Use the Theegarten follow-up page as the immediate customer asset.
- Implement the RapidCRM scheduled-send reliability plan before scaling outbound.
- Refresh pitch/application assets against the current release-check/local-AI/product-proof story.
Sources¶
- Operational GTM master plan and tracker.
01_tracks/go-to-market/plans/260526_rapiddraft-website-branch-reconciliation/README.md01_tracks/go-to-market/plans/260608_theegarten-follow-up-architecture-page/README.md01_tracks/go-to-market/plans/260617_rapidcrm-scheduled-send-reliability/README.md